
The problems we faced
Festivals are under increasing pressure to reduce their ecological footprint. Yet it remains a challenge to guarantee reliable and powerful energy supply at temporary locations without fixed infrastructure — such as the artist village at Clamotte Rock.

Our solution and key results
EnergyLabs delivered a fully charged 1MW battery container that powered all essential zones within the artist village. From lighting and food service to technical equipment used by over 45 artists — everything ran smoothly on our emission-free solution. The container was pre-charged at our site and could operate autonomously until the end of the festival.
© 2025 Energy Labs.AI All rights reserved.